Category: Case Studies

Construction

Case Study: HS2 Long Itchington

Background Balfour Beatty Vinci is a long established joint venture between two global leaders in the delivery of critical infrastructure. Balfour Beatty VINCI is responsible for designing and building part of the most exciting and challenging railway project in Europe: HS2. A launchpad is currently being built for a tunnel boring machine, which will dig a

Read More »
Healthcare

Case Study: GSK

Case Study Case Study: GSK Mobile Connectivity Improvement Project GlaxoSmithKline (GSK), Irvine GSK is engaged in the research and development (R&D) of innovative products in the areas of vaccines, medicines and consumer healthcare products. It has offices in more than 115 countries and produces biopharmaceutical and prescription products. 1 built in 1000 employees in scotland

Read More »
Healthcare

Case Study: Ninewells Hospital

Case Study Ninewells Hospital Mobile Connectivity Improvement Project Ninewells Hospital, Dundee Managed by NHS Tayside, Ninewells Hospital is a large teaching hospital based in Dundee, Scotland. It is internationally renowned for introducing laparoscopic surgery to the UK, and is a leading centre in the management of cancer, genetics as well as robotic surgery and psychosurgery. 

Read More »
Healthcare

Case Study: NHS Clatterbridge

Case Study NHS Clatterbridge Mobile Connectivity Improvement Project NHS Clatterbridge Completed in June 2020, The Clatterbridge Cancer Centre is a new 11 storey specialist care hospital that will help deliver specialist cancer care including immunotherapy and advanced radio therapy to people in Merseyside and Cheshire. The hospital is part of a £162 million investment intended

Read More »
Remote & Rural

Case Study: Afton Windfarm

Case Study Afton Windfarm Mobile Connectivity Improvement Project Afton Windfarm – Red Rock Power Afton Wind Farm is an operational 50 MW onshore wind development in located in East Ayrshire, Scotland. The wind farm will power up to 35,000 homes each year and is expected to generate 3.5 million MWh of electricity in its lifetime.

Read More »

Case Study: RAF Lossiemouth

Clarus Site Solutions is delighted to be working with Robertson Construction to deliver high speed internet and voice connectivity to the RAF Lossiemouth construction project. Background: The RAF Lossiemouth project is a £100 million development for Boeing which will be home to the new fleet of Poseidon MRA Mk1. This is set to boost the

Read More »
Commercial

Case Study: EICC

Case Study EICC Mobile Connectivity Improvement Project Edinburgh International Conference Centre Opened in 1995, the Edinburgh International Conference Centre (EICC) is a multi-purpose venue for events located in the heart of Edinburgh’s city centre. Since opening the building has struggled with poor mobile connectivity, unable to find a cost effective solution. Images credit: Edinburgh International

Read More »
Construction

Case Study: Edinburgh Trams

Image Credit: Trams to Newhaven, https://www.edinburgh.gov.uk/tramstonewhaven/ Clarus Site Solutions is delighted to be working with Sacyr Farrans Neopul and the City of Edinburgh Council to deliver the communications infrastructure for The Edinburgh Trams to Newhaven project, which was granted construction approval in November 2019. Background: The Trams to Newhaven project will connect Leith and Newhaven to

Read More »
Scroll to Top
starlink authorised reseller uk

As an Authorised Starlink Reseller, we can supply high-speed, low-latency connectivity in any country where they have coverage.

By partnering with Clarus, you will have access to a wider range of tariffs than you will see online and a host of additional services and support.