Case Study

Afton Windfarm

Mobile Connectivity Improvement Project

Afton Windfarm - Red Rock Power

Afton Wind Farm is an operational 50 MW onshore wind development in located in East Ayrshire, Scotland.

The wind farm will power up to 35,000 homes each year and is expected to generate 3.5 million MWh of electricity in its lifetime.

Images credit: Red Rock Power Ltd

The Challenge

Due to the remote location, this operational wind farm in East Ayrshire, Scotland was struggling with poor mobile phone connectivty inside the main control building.

The Solution

Our team attended and installed four of our Boost Pro mobile signal repeater units, high gain external donor antennas and multiple indoor omni antennas.

The entire control building now benefits from strong mobile voice and data connectivty across all four UK networks which helps to support the sites operational and health and safety efforts.

Scroll to Top

Enterprise connectivity will no longer be shaped by a single constellation, a single access technology or a standalone satellite terminal. It will be built around flexible architectures capable of selecting, combining and managing different networks according to the needs of each site, vessel, vehicle, workload and user.