Month: July 2020

Remote & Rural

Case Study: Afton Windfarm

Case Study Afton Windfarm Mobile Connectivity Improvement Project Afton Windfarm – Red Rock Power Afton Wind Farm is an operational 50 MW onshore wind development in located in East Ayrshire, Scotland. The wind farm will power up to 35,000 homes each year and is expected to generate 3.5 million MWh of electricity in its lifetime.

Read More »

Case Study: RAF Lossiemouth

Clarus Site Solutions is delighted to be working with Robertson Construction to deliver high speed internet and voice connectivity to the RAF Lossiemouth construction project. Background: The RAF Lossiemouth project is a £100 million development for Boeing which will be home to the new fleet of Poseidon MRA Mk1. This is set to boost the

Read More »
Scroll to Top

Enterprise connectivity will no longer be shaped by a single constellation, a single access technology or a standalone satellite terminal. It will be built around flexible architectures capable of selecting, combining and managing different networks according to the needs of each site, vessel, vehicle, workload and user.

LEO Fabric Live will explore the technology, commercial models and industry thinking driving that change.